Assembly Procedure for Cogent Guard Column Holder Installation
1. Component Inspection
-
Verify the guard cartridge matches specified requirements and is compatible with the HPLC Column stationary phase.
2. Holder Preparation
-
Disassemble the guard column holder if necessary.
3. Cartridge Insertion
-
Place the guard cartridge into the holder cavity. Note: Flow direction is not defined for cartridges in this configuration.
-
Do not apply excessive force during insertion.
-
4. Cartridge Securing
- Reassemble the holder with thread alignment.
- Finger-tighten securely, then apply an additional 1/8" clockwise turn using a 3/8" wrench to ensure seal integrity.
5. Leak Testing
- Connect the holder to the system using standard tubing.
- Conduct a low-pressure test to evaluate seal performance.
Leak Detection Method: Use the folded edge of a Kimwipe (lint-free paper) to touch the junction area of the column holder. If solvent is absorbed, incrementally tighten fittings in small amounts and retest until leakage ceases.
6. Setup Finalization
- Record cartridge details in the maintenance log (e.g., part number, installation date).
- Perform the r ecommended column performance test to establish baseline values for pressure and chromatographic behavior. This enables future verification if performance changes are observed.